Skip to main content
    Mon–Fri: 8am – 5pm Serving Avondale, Goodyear and the West Valley Arizona Licensed Contractor | ROC #345081, #359579, #359995
    (602) 510-5252
    Skinner & Son Logo
    Water-damage emergency? Call 602-319-4545 — Available 24/7
    Arizona Licensed Contractor

    Bathroom Remodeling

    Durable, comfortable bathrooms built for daily use

    Bathroom Remodeling

    Bathroom remodeling involves waterproofing, moisture management, and fixture selection in a small, heavily used space. We help you plan the layout, select tile and fixtures, and coordinate the plumbing and waterproofing steps so the finished bathroom holds up over time. Whether you are replacing a shower or remodeling the entire room, the scope determines the timeline and disruption.

    Full bathroom remodeling

    Shower replacement and tub-to-shower conversions

    Vanities and countertops

    Tile selection and installation

    Waterproofing and moisture management

    Ventilation and lighting updates

    Fixture selection and installation

    Storage and accessibility options

    Bathroom remodel with walk-in shower and custom vanity in a West Valley home

    Planning

    What affects the cost of a bathroom remodel?

    Several factors shape the scope and cost of a bathroom remodeling project. We review these with you during the consultation.

    Room size and layout changes

    Fixture changes (shower system, tub, toilet, vanity)

    Plumbing relocation for moved fixtures

    Tile selections and coverage area

    Shower system and glass enclosure

    Waterproofing method and materials

    Accessibility or aging-in-place features

    Electrical work for lighting or outlets

    Hidden water damage discovered during demolition

    Finish level and material grade

    Every project is scoped individually. Request a consultation and we will provide a written estimate tailored to your home.

    Getting Ready

    How to prepare for a bathroom remodel

    A little preparation goes a long way. Here's what to expect and how to get ready before construction begins.

    Plan for alternate bathroom access during construction

    Remove personal items, shower curtains, and accessories before demolition

    Discuss waterproofing method and tile selection early in the process

    Review fixture choices — shower system, vanity, toilet, and lighting

    Confirm whether accessibility or aging-in-place features are needed

    Protect flooring in hallways leading to the bathroom

    Client Stories

    WHAT OUR CLIENTS SAY

    We had the good fortune of being introduced to Chris during a recent remodel of 2 bathrooms in our second home in Verrado. We live out of state… We worked closely with his office/field manager Ashley and she kept us up to date every step of the way with pictures and updates. The project was completed on time, within our budget and to our complete satisfaction.

    Dave & Mary E.

    August 2026

    Google review

    Professional and dependable. Awesome to work with and great communication throughout our laundry room, powder room and dining area remodel. Would hire Chris again in a heartbeat!

    Karie P.

    August 2026

    Google review

    Chris and his crew did an amazing job on their [portion] of our kitchen renovation. Chris and his crews were professional, friendly, neat, and their workmanship quality was second to none. We will use them again, actually, we are talking with them now for a bathroom reno.

    Garth F.

    January 2026

    Google review

    Questions & Answers

    FREQUENTLY ASKED QUESTIONS

    Common questions about bathroom remodeling in the West Valley.

    A shower replacement or vanity update may take about a week, while a full bathroom remodel with layout changes, new tile, and plumbing relocation can take two to three weeks or more. We provide a project schedule during the consultation.
    Permits are typically required when the project involves plumbing relocation, electrical changes, or waterproofing work. We confirm permit requirements during the scope review.
    A tub-to-shower conversion removes an existing bathtub and replaces it with a walk-in shower. This is a popular option for homeowners who prefer easier access or want to update an older bathroom layout.
    Waterproofing is a critical step in any bathroom remodel, especially in shower areas. We use proven waterproofing methods behind tile to manage moisture and help prevent water damage over time. The method and materials are selected based on the shower system and layout.
    Yes. We can incorporate accessibility and aging-in-place features such as curbless shower entries, grab bars, and comfort-height fixtures. Discuss your needs during the consultation so we can plan the layout accordingly.

    How It Works

    OUR PROCESS

    A clear, step-by-step approach to planned remodeling projects. Water-damage emergencies follow a faster response path.

    01

    Initial Conversation

    Discuss goals, timeline, and budget.

    02

    Project Assessment

    Review the property and conditions.

    03

    Written Scope & Estimate

    Receive a clear, itemized proposal.

    04

    Construction

    Workmanship with regular updates.

    05

    Final Walkthrough

    Review the work and follow up.

    Related Services

    These services are often coordinated with bathroom remodeling.

    Bathroom Remodeling Service Areas

    We provide bathroom remodeling for homeowners in Goodyear and surrounding West Valley communities. These are service areas, not separate offices.

    Ready to Start Your Project?

    Tell us what you are planning and where the property is located. We will review the details and contact you about next steps.